Professional Engineers address Cobb County Site Plan Review

Homeowner’s Professional Engineer notes that various industry standards are ignored and points to Cobb County’s engineer’s comments regarding water runoff.

On June 21, 2016, Andrew Heath, P.E. with Cobb County Stormwater Site Plan Review, approved our house with a written note “Construct drive so runoff from curb will not flow down driveway.”

Cobb County Site Plan Review

September 2018 report on Site Plan Review:

“The Homeowner received various documents from Cobb County via an open records request (Document No. 11, above). One of the documents is a copy of the plat, which identifies the location of the home. This document was stamped by Cobb County Site Plan Review Section as being reviewed and approved on June 22, 2016. Additionally, the plat was reviewed and approved by the Stormwater Management Program on June 21, 2016.”

“The original plan called for the driveway to be located along the right side of the home (Figure 1, above). The industry standard is to locate the driveway at the higher elevation of the lot, in this case, along the right property line (Figure 2, below). This is not, however, how the home was constructed. The footprint of the home was reversed and the concrete driveway was constructed along the left property line.”

“It appears that the officials at Cobb County were concerned with the drainage on the lot before the home was constructed. The plat includes a hand-written note from Mr. Andrew Heath, PE, which states that the Builder is to “construct drive so runoff from curb will not flow down driveway.” The intent was to minimize the amount of surface runoff from the street in order to prevent damage to the home.”

How many times did Cobb County turn a blind eye during my Site Plan Review, and why? [Is Cobb County Ignoring Building Codes?]